Yes, there was a large koi pond already in the garden even before we moved in, albeit decommissioned. Photo taken in February 2005 as
we were viewing the property and garden for the first time.
The hole was gradually filled up with soil, organic material, and rubble. Photo taken in 2006
The fences in this area were old and falling apart and had to be replaced too.
If there was soil then we might as well grow something on it, although I don't think we actually harvested anything by the end of the season.
Photo taken in 2006
We started to plant out ornamentals on the designated border by 2007, and demarcated where a seating area should be. I've forgotten
how many tender plants we bedded out that time. Unfortunately Schefflera macrophylla turned out to be tender too!
The original patio as layed in 2008, using a mixture of materials available on hand then
We always knew there will be subsidence at some stage, it was just a matter of time and when. Organic matter rots, pockets of spaces that were inevitably not filled then would eventually get filled in, and the area will subside eventually. And that became evident last year. But we were far too busy then so it had to wait for awhile to be sorted.The weather last weekend was wonderful, and perfect too for bigger spring jobs, like sorting out the patio
The patio residents had to move elsewhere whilst work was in progress. As for the chairs...
They had three coats of stain a few weeks ago. I took this photo so I can actually see myself the difference between a stained and unstained
one. The color of the stain I used turned out to be so close to the original that I wasn't sure at first if it made any difference at all. At least the
colour is richer now and I know it's more protected against the elements.
The larger stones were kept and reused, whilst most of the smaller pieces were replaced with new and larger sandstone.
The leftover clay from the pond build came in very handy for this job!
And that time finally came, old flagstones were lifted up and more hardcore, rubble, and clay came in to level the area again. After they were compacted most of the old and weathered sandstone flags were relayed. Some of the smaller pieces of stone and paving that were used before had to go as this time we decided to mix in new but bigger sandstone flags with the old ones. These new ones should weather and blend in nicely with the rest of the old ones, gradually through the course of time.Someone is curious...
Here it is now after two days of work (albeit leisurely and plenty of gardening in between), stones relayed and the area level once again. Hopefully this will last and stay like this for quite some time. The stones were laid on a sand base without mortar joints so that they are very stable but also easy to remove for adjustments if and when subsidence happens again.Patio now relayed but work in the garden continues....
Eventually subsidence will stop as we gradually add more rubble and inorganic material, and from there we can do something more permanent for this spot. But for now we'll just have to keep exorcising the ghost of an old koi pond whenever it makes an apparition. Mind you exorcising isn't so bad especially when it is done on fine days with fab weather like it was last weekend!Mark :-)