We haven't shared an update on our latest project for a while so I thought it was time to put that right. We are making over the first pond, the one that started it all and led to building the large koi pond.

The major task has been to get the cladding on the walls, we have worked out a good routine with Mark cutting each piece to length with me fastening on. Getting a good rhythm going we have now completed everything that can be done at this stage.

Project Update
Project Update
With the site heavily constrained by plants, some of the bamboo have had to be tied back to give us space to work.
Project Update
Project Update
With the cladding finished, we have fitted guttering, opting for galvanised steel. I had expected this to be much harder than it actually was, with everything slotting and clamping together fairly easily.
Project Update
With the old shed gone, its best not to look too closely at the Jungle Hut which has had to house all the homeless items.
Project Update
The next phase of the project has kept us busy the last weekend. Next door have a large outbuilding, with a less than attractive faรงade facing us. With the fencing needing repairs we decided to embrace this and replace this entire section.
Project Update
The new fence will be wooden, but to ensure it lasts we have used concrete spurs to fasten everything else on to.
Project Update
Framing going up, all will be revealed in due course.
Project Update
Adjacent to the new shed we are creating a feature on the fence, The idea is to give the impression of a doorway into the larger building next door. Allowing us to blend it into the overall design, rather than having to completely hide it.
Project Update
Putting a frame together for what will become a small  roof over the door.
Project Update
And it is up.Sadly the long planted X Fatshedera lizei was in the way of the roof, so with a heavy heart this had a serious haircut. It should resprout, and was extremely leggy, so with any luck it will fill out and fit the new space much better.
Project Update
Project Update

Once the frame was up we were able to add the cedar shingles to complete the roof.  Before turning the the false door.

Project Update

The new fence and door above should help disguise the building next door, it is already creating an interesting little corner in the garden.

Still plenty to do though, the door and roof has some finishing off to do, before we can turn to painting it all and bringing this corner of the garden to life.

Following that we can finally turn to the pond. When we built this pond we built off a concrete slab already in place in the garden, however with a desire to extend down we have turned to professionals who are going to come in with heavy duty angle grinders and a concrete breaker to remove the old base and dig down. All being well we should have a big hole in the ground in another weeks time.