cork boards is generally designed for installation cork floating rate. These plates are usually individually and each not rotate while an adhesive or other fastening material is required. For this type of flooring installation compared with other types of soil, with this, you must first prepare the secondary surface.
Cork flooring can be installed on a concrete floor or basement. There are several steps, such as cork cellar to install concrete. First, make sure the surface you are using is clean, dry and flat. If possible, use a moisture content of the text. They may also include surface by using a lower layer of foam or cork cork polyurethane can be used effectively as a barrier to moisture, a pillow and a sound barrier to act as a. So you must cut the doorframe and that is sufficient to allow the lower skin to fit well.
Men preparing installation when cork flooring
On the other hand, if you need to install the cork on the surface of the discoloration below, there are preparations you need to make a little earlier. Make sure the surface where cork flooring is installed is clean and dry, and so shallow and safe.
If Cork install, always understand that they are always mounted on the surface as the use of some flooring adhesives. cork flooring, therefore, can be installed directly fixed to a certain type of wood floors or on some specific concrete slabs.
Installing cork flooring in concreteWhen installing the concrete floor cork, it is given also consider some preparations. First learns the concrete base are used to examine for the moisture content. Get patch a hole or crack depending on the recommendation of several manufacturers. Also cut the bottom of the door frame, and that's the cork to fit under. Make sure the surface is clean and smooth concrete, which is to ensure the piece of cork source.
Since the slabs have different natural variations in designs and colors, you can still order different boxes. This will help you choose the links that provide the desired look. With such a separator can leave an expansion space if the cork floor to install a fixed object or space limit. You must also apply the same amount of pressure on the surface of each plate, to hold them in place. After cork floors are available, and sealing after application, you can roll all over the floor as recommended by the manufacturer. After installing fact that the soil dries completely before entering. After finishing with polyurethane clean cork and sealed with a urethane sealant according to the manufacturer's recommendations.