Kitchen reno with in-floor heating placed under all tiles on main floor. 1/2″ uponor wirsbo quik Trak is used with 5/16″ Uponor Hepex tubing, complete with a 150BTU NTI Trinity Lx boiler system. Boiler supplies heat to 2 fancoils(forced air), 1 hot tub, in-floor heating in the bsmt(separated with a heat exchanger because of the old poly B pex), in-floor heating on the main floor(Uponor QuikTrak) and heats the domestic hot water with a priority hot water maker. Existing Poly B lines in joists used for heating are to be abandoned. Old SuperHot boiler was 225 MBTU, not 240 MBTU like it said in video.
Video Rating: 0 / 5