The goldfish pond makeover saw a large advance in the project today, thanks to Craig and his team at Akahana Koi. We had opted to get the professionals in for this phase, cutting through the concrete on which the existing pond was built, removing part of the old walls and then digging down to increase the volume of the pond.

Digging and Deconstruction


The concrete base was something we inherited with the garden and as a result had no idea how thick it was, we assumed it was fairly thick as it has been very stable despite trees being planted pretty close to it. Neighbours had told us that this concrete had been the base of a pig pen a previous owner had created for his pet pot bellied pigs. A six yard skip was delivered yesterday, which completely filled our small front garden. 

Digging and Deconstruction
The team set to work making light work of the old blockwork wall that had to be removed - so much so that it was gone before I even got chance to take a photo. fortunately I was able to get a quick picture of the concrete being removed,
Digging and Deconstruction
It turned out the concrete was actually laid in two layers, the top layer about 10cm thick, with another layer underneath and a layer of old hardcore below that.We were starting to wonder if this really had been prepared for pigs, seemed far more excessive than a pig pen would have suggested.It wasn't long until a nasty surprise...
Digging and Deconstruction
They discovered a still live electric cable running though the lower concrete layer. Hitting it with the angle grinder and tripping out the power. We had no idea it was there, and cant work out where it was going. Fortunately we realised it was somehow connected to the power for the Jungle Hut, so that circuit was safely turned off in the house. This will need to be traced back and made safe before we can turn the power back on.However despite this unexpected discovery, the work progressed well. Its amazing how fast experienced workers can undertake a task with the right tools and plenty of practice!
Digging and Deconstruction
Craig admiring his handy work.
Digging and Deconstruction
The finished hole (with severed cable). From the bottom of the hole to the top of the remaining wall is around 1.6m.And the resulting spoil in the skip to hopefully be collected in a couple of days time.
Digging and Deconstruction
As always it amazes me how much volume soil obtains when its dug out and piled up. But in just one day, several tonnes of soil and concrete have been excavated, ready for us to start the construction phase again. In many ways this next part will be similar to the build of the large koi pond. We will need to add a bottom drain to the hole, concrete the base and then build up blockwork walls to tie in to the existing structure.Busy times ahead!Gaz 