Business Magazine

Cost Overruns Jeopardize Artemis Moon Landing, Threaten NASA SLS Rocket’s Future

Posted on the 15 December 2024 by Phil's Stock World @philstockworld

A problem with a space capsule heat shield has forced NASA to postpone two highly anticipated flights to the moon, including one that would land astronauts on the lunar surface. The heat shield is the latest in a series of setbacks for the Artemis project, which aims to return humans to the moon. ...

This post was originally published on this site


Back to Featured Articles on Logo Paperblog