Home Magazine

All of These Prefabs Were Assembled in 10 Days Or Less

By Dwell @dwell
Prefab Courmayeur Ski and Snowboard School is weather-resistant.

Ten Days

LEAPfactory’s home for the Courmayeur Ski & Snowboard School is a compelling example of how outdoor facilities can embrace rather than conquer nature. Located in the Aosta Valley of northern Italy, the building sits atop light foundations and was erected in ten days using the LEAPs3 construction system. As a result, it can be removed or relocated without leaving permanent traces.


Back to Featured Articles on Logo Paperblog