Once the floor and 20 cm of sand were out, Toms dad pounded down the sand, and we started putting in the insulation.
First part of insulation was fitting in a layer of thick plastic sheeting. On top of that came the puzzle that is insulation. On top of that came yet again a layer of plastic sheeting. Now we just have to wait for the electrician to finish, and we’re back to flooring.