... and We're Finished!

Posted on the 19 June 2020 by Markwadsworth @Mark_Wadsworth

Before:

After:

And why did this take me nearly a whole week?
There are eighteen doors (and three drawers) which require eight steps (six for the drawers):
- remove door and knob,
- spray with degreaser, scrape off gunk, wash with soapy water and leave to dry,
- first coat all over with 1 part paint to 19 parts thinners to seal the surface a bit,
- drill additional holes for handles and counter-sink on the back (bolts were a bit too short),
- proper second coat on front,
- proper second coat on back,
- proper third coat on front,
- fit handles, re-fit door, faff about with hinges.
Including sticking up dust sheets so that I had somewhere to rest them while they dried, several trips to Screwfix, tea and fag breaks, and replacing two sets of hinges* which were completely knackered, it works out at about 1.5 hours per door and 1 hour per drawer, that's basically a full week's work.
* The new design Häfele hinges (£4.29 per pair) are brilliant. Once you've screwed the back plate to the side and popped the door on, you can adjust them for left/right and forward/backward (as on the previous design) but the new design has a third grub screw for up/down as well.